Plinth Area Rates of CPWD – Download as PDF File .pdf), Text File .txt) or read online. RG Segaran. PWD (W.B.) SCHEDULE OF RATES, Uploaded by. Building Schemes during the year are approved and furnished in Annexure I, II, III, IV I PLINTH AREA RATES FOR THE YEAR FOR THE PREPARATION OF ROUGH COST ESTIMATE.j. .. Plinth Area Rates of CPWD. CPWD PLINTH AREA RATES YEAR BASE CPWD Cost Index Calculation at Delhi on different dates Base Year Base

Author: Meztizilkree Vushakar
Country: Burma
Language: English (Spanish)
Genre: Career
Published (Last): 12 September 2007
Pages: 45
PDF File Size: 1.98 Mb
ePub File Size: 10.90 Mb
ISBN: 893-8-85898-862-1
Downloads: 70384
Price: Free* [*Free Regsitration Required]
Uploader: Zulkitaur

Type —IV Foundation Bearing capacity 10 tonnes per sq. Power Points 15 amperes, 6 pins 2 3 4 5 6 7 1 2.

Cost of bulk services water supply, sewage disposal e. Fresh Plinth Area Rates with baseas on 1. Dealers In India Price: Wed Mar 05, 5: Copy of Cost Indices West Bengal. O cpdd refer to Valuation Officer V.

Thu Aug 29, 3: Remember me Forgot password? Shutters to match with frame.

Copy of Cost Indices Haryana Base The goods and service tax rates for building materials are as follows: Waste coupling in wash basins and grating over the floor trap shall be only of PTMT. Telephone Point – 1 2 2 – 8. CPWD plibth not be responsible for any ambiguity, discrepancy, dispute or financial loss, arising directly or indirectly cpd using or following items of PAR by such Govt. The panelling with prelaminated particle board, both sides decorative35 mm thick panelled shutter with hard wood styleand rails.

  DIBUJARTE 47 PDF

R Volume II and I. Up to six 06 Storeys, Floor ht 3. Therefore, stakes are high No part of this publication, either in English or in Hindi, may be reproduced in any form or by any means, electronic or mechanical, including photocopy, recording or any information storage and retrieval system, without permission, in writing, from the Director General, CPWD, New Delhi. The panelling with pre-laminated particle board, one side decorative mm thick panelled shutter with hard wood style and rails.

This does not include the cost of land. No discount is allowed for work done through a contractor.

Plinth area rates pdf

Delhi Civil Raets Cost Indices to External sliding door bolt and handles will be in powder coated M. In cases where rztes building consists of — columns projecting beyond cladding, the plinth area shall be taken up to the external face of the cladding and shall not be included the projections of the columns. Single Phase 1 – – – 1 B. Wed Jun 18, 7: The Delhi Schedule of Rates Electrical which is the revised edition.

  BEIBEL NA PAPIAMENTU PDF

central pwd plinth area rates (1.10.2012) – CPWD

Blusmiddelen en nooduitgangen nooit blokkeren! Floor ht height 2.

Before a plant is planted on a particular site, a soil test should be conducted t. In future, Preliminary Estimates may be prepared on the basis of these plinth area rates.

The valuer is bound to explain ratio decidendi The rational for a decision failing which the report can be ignored by bringing in departmental valuation report.

Wire mesh shutters may also be provided at the discretion of Zonal Chief Engineer. A hypothetical summary of expenditure: See illustrative sketch given below: R-type-V, VI and above.

Assessed Fair Cost of Afea. Pressed steel frames made out of corrosion resistant coated sheet of 1. They are based on the fundamental principle that the plinth area of a building should present a true picture of the covered floor area provided in the plan.

We share information about your activities on the site with our partners and Google partners: